[Jun 21, 2023] Step by Step Guide to Prepare for CT-TAE Exam BrainDumps [Q23-Q42]

Share

Jun 21, 2023 Step by Step Guide to Prepare for CT-TAE Exam BrainDumps

Test Automation Engineer CT-TAE Real Exam Questions and Answers FREE Updated on 2023


To become certified, candidates must pass the CT-TAE certification exam, which is a rigorous, three-hour test consisting of 40 multiple-choice questions. The exam is designed to evaluate the candidate's understanding of fundamental test automation concepts, as well as their ability to apply these concepts in practical situations. Candidates must achieve a minimum score of 65% to pass the exam.


The ISTQB CT-TAE exam is a globally recognized certification that demonstrates an individual's expertise and proficiency in test automation engineering. The exam consists of multiple-choice questions and is designed to test the candidate's understanding of test automation concepts, frameworks, and tools. To become certified, candidates are required to pass the exam, which is administered by the International Software Testing Qualifications Board (ISTQB). The certification is valid for three years and can be renewed by taking a re-certification exam or by accumulating sufficient professional development units. The ISTQB CT-TAE certification is highly valued by employers and is often a requirement for job positions in software testing and development.

 

NEW QUESTION # 23
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.
Which of the following statements is TRUE?

  • A. The pilot project should have been critical so that maximum benefits were delivered
  • B. The target defined for the project was inappropriate, because the automation regime for the automated tests at the end of the pilot is not yet mature.
  • C. The test process should be radically changed to gain additional benefits from using the tool.
  • D. The approach used for deployed this tool is aligned to the standard success factor for deployment

Answer: D


NEW QUESTION # 24
If you are tracking the frequency that a test automation code reports a defect that is not really a defect, what metric are you gathering?

  • A. The number of false-fail results
  • B. Automation code defect density
  • C. Tool scripting metrics
  • D. Trend metrics

Answer: A


NEW QUESTION # 25
You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Which of the following layers of the gTAA should you focus on for the TAS?

  • A. The test Generation layer
  • B. The Test Execution layer
  • C. The Test Adaption layer
  • D. The Test Definition layer

Answer: C


NEW QUESTION # 26
You are implementing test automation for a project and you want to be able to generate test cases automatically using a series of test design tools which use a variety of test design techniques such as decision tables, pairwise testing and boundary value analysis.
You also want to generate test data automatically which can then be used by the tests.
Initially these tests will be run manually to verify their correctness and ultimately you want to include them in the test execution tool so that they can run unattended.
Which layer of the gTAA will be used to support the specification of the test cases and preparation of the test data?

  • A. The execution layer
  • B. The adaptation layer
  • C. The generation layer
  • D. The definition layer

Answer: D


NEW QUESTION # 27
A major component of your organisation's Test Automaton Solution (TAS) is a popular open-source third-party capture-replay tool for automated functional testing.
Which two of the following must the Test Automation Engineer (TAE) ensure happens for this TAS?
a) The third party tool is placed under configuration management control.
b) The annual support and maintenance costs are agreed with the tool's vendor.
c) It is Important to obtain information about updates and new versions of the tool so that the third party tool is kept up to date.
d) Ensure that the TAS test scripts are integrated into the tool's framework.
e) Ensure that no changes are made to the tool, because modifications are not allowed for third party products.

  • A. d and e
  • B. a and c
  • C. a and b
  • D. c and d

Answer: C


NEW QUESTION # 28
Consider a SUT that small run on multiple platform during the execution of automated test runs. In each test run an automated test suite needs to be executed, with the same version of the TAF, against the same version of the SUT of each platform. Each platform shall have its own dedicated test environment. Your goal is to implement a process as automated as possible ( i.e with minimal manual intervention) that allows implementing a consistent setup of the TAS across the multiple test environments.
Which two of the following aspects are MOST relevant for achieving your goal in this scenario?
The configuration of the TAS uses automated installation scripts
The TAF saves the logs needed to debug errors in XML format
C) Features of the TAF not used by the automated tests have been tested D) All the automated test cases contain the expected results E) The TAS components are under configuration management

  • A. A and d
  • B. B and d
  • C. A and e
  • D. B and c

Answer: C


NEW QUESTION # 29
If model-based testing has been selected for the overall test automation approach for a project, how does that influence the layers of the TAA?

  • A. There will be no need for the execution layer
  • B. All layers are used, but the test generation layer will be automated based on the defined model
  • C. There will be no need to design the tests for the API because those will be covered by the model
  • D. No adaptation will be needed because the interfaces will be defined by the model

Answer: B


NEW QUESTION # 30
You have been asked to determine a TAS for a new release of a SUT, test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?

  • A. Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.
  • B. Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.
  • C. Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.
  • D. Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.

Answer: A


NEW QUESTION # 31
Consider a TAS deployed into production. The SUT is a web application and the test suite consists of a set of automated regression tests developed via GUI. A keyword-driven framework has been adopted for automating the regression tests. The tests are based on identification at low-levels of the web page components (e.g class indexes, tab sequence indexes and coordinates) in the next planned release the SUT will be subject to significant corrective maintenance (bug-fixes) and evolution (new features) Maintenance costs to update the test scripts should be as low as possible and the scripts must be highly reusable.
Which of the following statements is most likely to be TRUE?

  • A. The keyword-driven framework is not suitable, it would be better to adopt a structured-scripting approach
  • B. The keyword-driven framework introduces a level abstraction that is too high and makes it difficult what really happens
  • C. False positive errors are likely to occur when running the automated tests on the new releases without modifying the test
  • D. The total execution time of the automated regression test suite will decrease for each planned release.

Answer: A


NEW QUESTION # 32
Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.
Which of the following is NOT a consideration when designing for testability?

  • A. Clearly defined architecture: The SUT Architecture needs to provide clear and understandable interfaces giving control and visibility on all test levels.
  • B. Control: the SUT needs to provide interfaces that can be used to perform actions on SUT.
  • C. Observability: The SUT needs to provide interface that give insight into the system.
  • D. Re-useability: The code written for the SUT must be re-useable for other similar system.

Answer: D


NEW QUESTION # 33
Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields ( e.g text boxes).
What is the BEST recommendation for improving the TAS?

  • A. Implementing keywords with higher level of granularity
  • B. Implementing standard setup and teardown functions at test case level
  • C. Improving the architecture of the application in order to improve its testability
  • D. Adopting a set of standard verification methods for use by all automated tests

Answer: A


NEW QUESTION # 34
You are working on a web-based application called Book Vault that allows people to upload books and order books. This application must be available on all major browsers.
You have been testing the application manually and management have asked you to consider automating some of the tests.
You have investigated a number of commercial and free tools which can automate tests at a web browser level and one tool in particular meets your requirements and you have implemented a trial version.
You have basic programming skills and the main goal is to automate a few functional tests to see if the tool is compatible with the application and can recognise the objects and controls.
Which scripting technique would be MOST suitable in this scenario in order to meet the objectives?

  • A. Structured scripting
  • B. Data-driven scripting
  • C. Model-based scripting
  • D. Capture-replay scripting

Answer: D


NEW QUESTION # 35
A regression test suite consist of 500 test cases which are all executed manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lasted one month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.
Which of the following statements is TRUE in this scenario?

  • A. The duration of the pilot project was too short -it should last unit the success factors are achieved
  • B. The target defined for the business case seems difficult to hit - it should be realistic
  • C. The target defined for the business case is too accurate -it should not be measureable
  • D. The project selected for the pilot is too critical -if should not be too critical or too trivial

Answer: B


NEW QUESTION # 36
A SUT has an existing automated test suite.
Which of the following statements relating to the introduction of new features in the SUT is TRUE?

  • A. The introduction of a new feature could require updates or additions to the testware components
  • B. The test automation engineer should work with the business analysts to ensure the new feature is testable
  • C. It is generally more difficult to automate test cases for a new feature as the development has not yet started
  • D. Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort

Answer: A


NEW QUESTION # 37
Your TAS has been running successfully on a Windows/GUI based SUT for some years. The SUT has undergone minimal change over the years to maintain business as usual, deploying six-monthly releases for minor enhancements and bug fixes using a waterfall lifecycle.
The TAS has not changed at all during this period. The current project for the SUT will be using the Scrum methodology to deliver a more modern, competitive, user interface. It is in the release planning stage with an agreed release backlog and set of sprints outlined.
The move from lengthy waterfall releases to shorter sprints has led you to conduct a review of the current TAS to make sure it is robust and fully optimised for the timescale challenges of the new project.
What two steps would be BEST to undertake during the review?
a) Ensure that new automation code is using the same naming conventions as existing code.
b) Perform a full regression run in Sprint 1 to identify what improvements could be made to the TAS for future sprints.
c) Ensure that the TAS is using the latest libraries for the operating system.
d) Review the functions that act upon the controls for the GUI for possible consolidation.
e) Involve the test team to see what ease-of-use improvements they would like to see made to the TAS.

  • A. b and c
  • B. d and e
  • C. a and b
  • D. c and d

Answer: A


NEW QUESTION # 38
You are using a gTAA to create a TAS for a project. The TAS is aimed at automatically and executing test cases based on a use-case Modeling approaching that uses UML as a modeling language. All the interaction between TAS and SUT will only be at the API and GUI level.
Which of the following components of the gTAA would you EXCLUDE from the TAS?

  • A. The Command Line Interface (CLI) component of the test adaptation layer
  • B. The Test execution component of the test generation layer
  • C. The test execution (test engine of the test execution layer
  • D. The test reporting component of the test execution layer.

Answer: A


NEW QUESTION # 39
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

  • A. Take a backup of the database in its current state. So It can be analyzed later
  • B. Re-run the test automation suite starting from the 12th test
  • C. Return the database to a consistent state that allows subsequent test to run
  • D. Re-run the test automation suite starting from the 1st test.

Answer: A


NEW QUESTION # 40
You are planning the pilot for an in-house developed Test Automation solution (TAS).
Which two of the following would be important steps to take as part of the planning process?
a) Review your organisation's current projects and identify which one would be most suitable to pilot the TAS.
b) Ensure that the developers will provide the necessary commitment for the TAS deployment activities.
c) Run a series of training workshops for new users of the TAS before they are asked to use it.
d) Develop a project plan for the pilot and reserve the necessary budget and resources for its implementation.
e) Ask the developers to provide any missing functionality during the deployment activities.

  • A. c and e
  • B. b and d
  • C. a and b
  • D. c and d

Answer: B


NEW QUESTION # 41
What is the PRIMARY advantage of using abstraction in the TAA?

  • A. It improves the performance of the TAS
  • B. It requires a higher skill level to implement
  • C. It ensures that any scripting method will be supported
  • D. It makes it more flexible for future reuse and improvements

Answer: D


NEW QUESTION # 42
......


The CT-TAE certification is ideal for software testers who specialize in test automation and are looking to advance their careers. It is also suitable for individuals who are involved in software development and want to gain a better understanding of test automation. The certification exam covers various topics, including test automation design, implementation, and maintenance, as well as test automation frameworks and tools. Passing the CT-TAE exam provides individuals with a globally recognized accreditation that demonstrates their expertise in test automation and enhances their professional credibility.

 

Ultimate Guide to Prepare CT-TAE Certification Exam for Test Automation Engineer: https://pass4sure.actualpdf.com/CT-TAE-real-questions.html