[Jul-2026] Exam Sure Pass SAP Certification with C-P2W43-2023 exam questions [Q47-Q68]

Share

[Jul-2026] Exam Sure Pass SAP Certification with C-P2W43-2023 exam questions

Real SAP C-P2W43-2023 Exam Questions Study Guide

NEW QUESTION # 47
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.

  • A. Plant Maintenance Information Systems (PMIS)
  • B. SAP Quick Viewer
  • C. SAP Crystal Reports
  • D. SAP Lumira

Answer: C,D


NEW QUESTION # 48
What is the goal of embedded analytics in SAP S/4HANA?

  • A. To combine transactional and analytical processing
  • B. To integrate BW Data Store Objects
  • C. To allow both tactical and strategic analyses within the S/4HANA core
  • D. To integrate BW Info Cubes

Answer: A


NEW QUESTION # 49
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question

  • A. Inspection point type assigned to the task list header
  • B. QM inspection plan with assigned inspection characteristics
  • C. Master inspection characteristics assigned to PM task list operations
  • D. Classification data assigned to a technical object

Answer: A,C


NEW QUESTION # 50
How do you map a counter replacement in SAP S/4HANA Asset Management?

  • A. Create a new measurement document marked as a counter replacement.
  • B. Assign a catalogue type for counter replacement to the measuring point category.
  • C. Deactivate the current counter and create a new counter.
  • D. Create a new measurement document and assign a valuation code for counter replacement.

Answer: A


NEW QUESTION # 51
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question

  • A. Plan repair work for the responsible work center
  • B. Find malfunction records already created in a list
  • C. Complete the malfunction report
  • D. Assign a production resource tool (PRT) to the operation
  • E. Verify planned and actual costs

Answer: A,B,C


NEW QUESTION # 52
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

  • A. Open purchase requisitions are recompiled
  • B. Open reservations are recompiled.
  • C. Open purchase orders are recompiled.
  • D. Referenced notifications are put in Process again.

Answer: A,B


NEW QUESTION # 53
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question

  • A. Assign an Inspection Type to a Maintenance Order Type.
  • B. Create a control key which expects inspection characteristic assignments
  • C. Maintain settings at plant level for usage decisions.
  • D. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant

Answer: A,C


NEW QUESTION # 54
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?

  • A. It always uses the risk-based assessment for prioritization.
  • B. It is a new business object with no connection to a maintenance notification.
  • C. It is mandatory to assign a task list to the maintenance request.
  • D. It contains an additional screening phase where requests can be accepted or rejected.

Answer: D


NEW QUESTION # 55
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question

  • A. Maintenance planner group
  • B. Storage location
  • C. Organizational unit
  • D. Maintenance work center

Answer: B,D


NEW QUESTION # 56
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

  • A. A purchase requisition will ALWAYS be created as soon as the order is saved.
  • B. The maintenance order can be set to TECO before the invoice is created
  • C. A purchase order is created automatically as soon as the order is saved.
  • D. A goods receipt can be posted after the maintenance order is technically completed.
  • E. A purchase requisition can be created automatically as soon as the order is saved.

Answer: A,B,E


NEW QUESTION # 57
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question

  • A. SAP Service and Asset Manager (formerly SAP Asset Manager)
  • B. Worker Safety applications
  • C. SAP Asset Performance Management
  • D. SAP Work Manager

Answer: A,C


NEW QUESTION # 58
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question?

  • A. It is based on an SAP Fiori tile catalog.
  • B. It is assigned via a portal role.
  • C. It provides only HTML5-based apps
  • D. It can be assigned directly to the user via personalization

Answer: A,D


NEW QUESTION # 59
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. Technical completion date of the maintenance order
  • B. The date of the final confirmation
  • C. Actual finish date of the maintenance order
  • D. Planned date of the next call, independent of maintenance order dates

Answer: A


NEW QUESTION # 60
Which default object type do you use to settle a refurbishment order?

  • A. The fixed asset
  • B. The material
  • C. The cost center
  • D. The WBS element

Answer: B


NEW QUESTION # 61
You schedule a Maintenance Service Plan. Which call object is generated?

  • A. Customer Service Order with assigned DIP profile
  • B. Maintenance Order which is linked to a Service Order Header
  • C. Customer Service Order with an external order operation
  • D. Maintenance Order which is linked to a Service Order Item

Answer: A


NEW QUESTION # 62
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Call horizon
  • B. Scheduling type
  • C. Package offset
  • D. Initial/subsequent buffer

Answer: D


NEW QUESTION # 63
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question

  • A. Assign a piece of equipment with an allocated measuring point to a task list operation
  • B. Assign an inspection lot to the task list header
  • C. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
  • D. Assign an inspection document as a PRT to the task list operation.

Answer: A,C


NEW QUESTION # 64
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

  • A. For the combination of order type and planner group, you can decide when reservations are created
  • B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
  • C. Reservations are created only after a material availability check has been performed
  • D. All open reservations are closed when the maintenance order is set to TECO.

Answer: B,D


NEW QUESTION # 65
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Start date
  • B. Scheduling period
  • C. Scheduling indicator
  • D. Factory calendar

Answer: A,B


NEW QUESTION # 66
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question

  • A. Change BOM Create a work order on the ESRI map
  • B. Confirm time sheets Attach documents
  • C. Display maps Display and maintain technical objects
  • D. Schedule resources Change task list

Answer: B,C


NEW QUESTION # 67
How can you assign a material BOM to a piece of equipment?

  • A. Via field model number in the equipment master
  • B. Via field construction type
  • C. Via material BOM header in the serialization data
  • D. Via creation of an equipment BOM

Answer: B


NEW QUESTION # 68
......

Updated and Accurate C-P2W43-2023 Questions for passing the exam Quickly: https://pass4sure.actualpdf.com/C-P2W43-2023-real-questions.html