Fast, easy and secure payments
In order to ensure the safety of payment when you purchase our PVIP actual lab questions, we have strict information system which can protect your secret. On the other hands, we support multi-channel payment platform with credit card. You can choose the most convenient for you. Or if you have another issues whiling purchasing our PVIP certification training files we are pleased to handle with you soon. You can email us or contact via 24/7 online service support. We not only provide high pass-ratio PVIP torrent PDF but also spear no effort to protect your purchase process from any danger and concern.
It is acknowledged that NABCEP certificate exams are difficult to pass for workers in the industry, but you need not to worry about that at all because our company is determined to solve this problem, and after 10 years development, we have made great progress in compiling the PVIP actual lab questions. Our company have employed many top IT experts in different countries to compile this PVIP certification training for IT exam during the 10 years, and we are so proud that our PVIP pass ratio have become the leader in the IT field and we have a lot of regular customers for a long-term cooperation now. We are look forward to become your learning partner in the near future.
Enjoy the fast delivery of PVIP exam materials
There is no doubt that everyone would like to receive his or her goods as soon as possible after payment for something, especially for those who are preparing for the NABCEP PVIP exam, and we all know that nothing is more precious than time. Since our PVIP actual lab questions are electronic products, we can ensure you the fast delivery. Our operation system will send the PVIP certification training files to you in 5-10 minutes after your payment by e-mail automatically, and we can promise you this is absolutely the fastest delivery in this field. Do not waste your time any more, just buy it now, and you can get the most useful PVIP study materials files only 5-10 minutes later.
Instant Download: Upon successful payment, Our systems will automatically send the product you have purchased to your mailbox by email. (If not received within 12 hours, please contact us. Note: don't forget to check your spam.)
Download the PVIP free trial before buying
Our PVIP actual lab questions have been praised as the best study materials in the IT field in many countries, but if you still have any hesitation, you are welcomed to download the PVIP free trial to get a general knowledge of our products in our website before you make a decision. I am sure that you will be very satisfied with our PVIP certification training files. Do not wait and hesitate any more, just take action and have a try of PVIP training demo, and all you need to do is just click into our website and find the “Download for free” item, and there are three kinds of versions for you to choose from namely, PDF Version Demo, PC Test Engine and Online Test Engine, you can choose to download any one of the PVIP practice demo as you like.
NABCEP PV Installation Professional (PVIP) Board Certification Sample Questions:
1. The following dc portion of a PV schematic (functionally grounded conductor not shown) is submitted to the building official for permit approval. The building official, who also is he AHJ, allow the system to be installed by requiring what NEC-required MINIMUM size equipment grounding conductor at Location A?
A) #6 aluminum
B) #8 copper
C) #10 copper
D) #12 aluminum
2. A site survey indicates a residential roof with a 4:12 pitch facing 20° east of south. The local latitude is 35°N, and the optimal tilt for maximum annual production is equal to latitude. What adjustment should be made to compensate for the roof's orientation and tilt to achieve near-optimal output?
A) Install adjustable racking to match 35° tilt
B) No adjustment needed; output loss is negligible
C) Increase array capacity by 5%
D) Rotate modules 20° west to face true south
3. An installer was asked to provide a means to measure the voltage of each battery in a system. The bank is located 50 ft.
From the data logger. The installer will be using shielded. Twisted pairs of instrumentation wiring, all run in the bundle a conduct.
The signals are connected to isolated and ungrounded inputs at a data logger. Which safely precaution is MOST needed to protect the instrumentation wiring?
A) Individual nonfused disconnects are required for each set of wiring because all of the signals must be isolated from each other.
B) The instrument wiring must be large (larger than # 18 AWG) to handle current from each battery and must be a double- insulated type.
C) An appropriately rated and sized of resistive elements for each twisted pair be located at, or very near to, the data logger terminals
D) Each set of twisted pairs must be provided with properly rated fuses that are physically located at the battery.
4. A 12 kW array has a measured output of 10 kW at STC due to mismatch losses. What is the mismatch loss percentage?
A) 10%
B) 15%
C) 12%
D) 16.7%
5. A PV system is located at 41 N latitude. The sun angle is 23 on December 21 at solar noon. Assuming that the
65 ft tree is directly south of the PV array and will grow 20 ft. over the life of the PV system, what is the MNIMUM distance the tree to the button of the prevent shading?
A) 201 ft.
B) 98 ft.
C) 167 ft.
D) 153 ft.
Solutions:
| Question # 1 Answer: C | Question # 2 Answer: A | Question # 3 Answer: D | Question # 4 Answer: D | Question # 5 Answer: A |
PDF Version Demo



